Methane Detection by Satellite & Drone (OGMP 2.0 Level 5)
Build measurement-based methane inventories using satellites, drones and continuous sensors.
Design permanent barriers that keep legacy wells safe when reservoirs are converted to CO₂ storage.
Integrity, inspection, reservoir and operations engineers; asset managers; technical authorities in oil, gas and petrochemicals.
Days 1–5 as in the 5-day programme, then:
| Date | Location | Format | Fee |
|---|---|---|---|
| 22–26 Feb 2027 | Barcelona, Spain | Classroom · 5 days | $5,000 |
| 17–21 May 2027 | Live online | Live online · 5 days | $2,500 |
| 9–20 Aug 2027 | Seoul, South Korea | Classroom · 10 days | $9,000 |
| 31 Oct – 4 Nov 2027 | Dubai, UAE | Classroom · 5 days | $5,000 |
| 27–31 Mar 2028 | Sydney, Australia | Classroom · 5 days | $5,000 |
| 19–23 Jun 2028 | Live online | Live online · 5 days | $2,500 |
| 10–21 Sep 2028 | Manama, Bahrain | Classroom · 10 days | $9,000 |
| 4–8 Dec 2028 | London, United Kingdom | Classroom · 5 days | $5,000 |
| 4–8 Feb 2029 | Kuwait City, Kuwait | Classroom · 5 days | $5,000 |
| 30 Apr – 4 May 2029 | Live online | Live online · 5 days | $2,500 |
| 23 Jul – 3 Aug 2029 | Rome, Italy | Classroom · 10 days | $9,000 |
| 15–19 Oct 2029 | Kuala Lumpur, Malaysia | Classroom · 5 days | $5,000 |
| 11–15 Mar 2030 | New York, USA | Classroom · 5 days | $5,000 |
| 3–7 Jun 2030 | Live online | Live online · 5 days | $2,500 |
| 26 Aug – 6 Sep 2030 | Cape Town, South Africa | Classroom · 10 days | $9,000 |
| 17–21 Nov 2030 | Doha, Qatar | Classroom · 5 days | $5,000 |
Build measurement-based methane inventories using satellites, drones and continuous sensors.
Reservoir Simulation & History Matching: an advanced, practice-led programme for petroleum, reservoir, drilling, production and refinery professionals, built on current international standards, real case studies and hands-on workshops.
Pressure Transient Analysis & Well Testing: an advanced, practice-led programme for petroleum, reservoir, drilling, production and refinery professionals, built on current international standards, real case studies and hands-on workshops.
Use Total Focusing Method, FMC and advanced phased array to find and size CUI without stripping insulation.
Assess, test and qualify existing steel pipelines to carry hydrogen and hydrogen–natural gas blends.
Fuel Station Services Management: an advanced, practice-led programme for petroleum, reservoir, drilling, production and refinery professionals, built on current international standards, real case studies and hands-on workshops.